1. Water Supply Construction Projects

Arbaminch University Water Supply Expansion Project

  • OWNER: Arbaminch University
  • MAJOR ACTIVITIES: 500 M3 Concrete Reservoir, Valve Chamber for Reservoir, Borehole Drilling (2 each 90m depth), Generator House, Electromechanical Works.
  • CONTRACT AMOUNT: Birr 4,968,138.00
  • CONTRACT SIGNED: July, 2009
  • STATUS:

 Bitena Water Supply Project

  • OWNER: SNNPR Water Resources Development Bureau
  • MAJOR ACTIVITIES: Spring Capping, 25 M3 Wet-well, 70 M3 Wet-well, Pressure Main, Pipe Pillars & Trench excavation in the gorge, Stair Cases, Valve Chamber in wet well and Pressure main, Electromechanical Equipments Installation, Generator House, Water Points.
  • CONTRACT AMOUNT: Birr 5,602,128.36
  • CONTRACT SIGNED: December, 2008
  • STATUS:

 Meger Water Supply Project

  • OWNER: SNNPR Water Resources Development Bureau
  • MAJOR ACTIVITIES: Pipe Work, 50 M3 Masonry Reservoir with Valve Chamber, Valve Chamber in Network, Electromechanical Equipments Installation, Water Points.
  • CONTRACT AMOUNT: Birr 1,533,016.32
  • CONTRACT SIGNED: December, 2009
  • STATUS:

Girar Cheha Water Supply Project

  • OWNER: SNNPR Water Resources Development Bureau
  • MAJOR ACTIVITIES: 200 M3 Reinforced Concrete Reservoir with Valve Chamber, Spring Capping, Anchor Blocks (43), Pipe line, Water Points (9), Valve Chamber in Network (6).
  • CONTRACT AMOUNT: Birr 3,511,687.22
  • CONTRACT SIGNED: November, 2008
  • STATUS:

Omo Sheleko Water Supply Project

  • OWNER: SNNPR Water Resources Development Bureau
  • MAJOR ACTIVITIES: Borehole Drilling, Generator House, Electro-mechanical Works, Cattle trough (2), Valve Chambers (3), Pipe line, Four-Fauceted Water Points (7), Maintenance of 50 M3 Reservoir.
  • CONTRACT AMOUNT: Birr 2,698,562.00
  • CONTRACT SIGNED: November, 2008
  • STATUS:

Debub Wase Gebeta Water Supply Project

  • OWNER: SNNPR Water Resources Development Bureau
  • MAJOR ACTIVITIES: Generator House, Electro-mechanical Works, Cattle trough, Valve Chambers, Pipe line, 10 M3 steel tank, Four-Fuaceted Water Points.
  • CONTRACT AMOUNT: Birr 1,228,753.49
  • CONTRACT SIGNED: November, 2008
  • STATUS:

Korke Water Supply Project

  • OWNER: Sidama Zone Water Resources Development Office
  • MAJOR ACTIVITIES: Pipe work, 10 M3 steel tank, GI Sheet Generator House, Water Points, supply and install pump and generator, Valve Chambers
  • CONTRACT AMOUNT: Birr 2,184,531.00
  • CONTRACT SIGNED: February, 2009
  • STATUS:

Chiri Kumburta Water Supply Project

  • OWNER: Sidama Zone Water Resources Development Office
  • MAJOR ACTIVITIES: Pipe work, 25 M3 sandwich masonry reservoir, 20 M3 wet-well, Six-fauceted Water Points, Valve Chamber in network, valve chamber for reservoir, spring capping, supply and install pump and generator, generator house
  • CONTRACT AMOUNT: Birr 799,433.55
  • CONTRACT SIGNED: February, 2009
  • STATUS:

Gambella Water Supply Project

  • OWNER: Sidama Zone Water Resources Development Office
  • MAJOR ACTIVITIES: 100 M3 Concrete Reservoir, Pipe work, Valve Chamber, Generator House, Water Points
  • CONTRACT AMOUNT: Birr 1,447,386
  • CONTRACT SIGNED: June, 2009
  • STATUS:

Sala Gorbe1 Water Supply Project

  • OWNER: Sidama Zone Water Resources Development Office
  • MAJOR ACTIVITIES: Two 300 M3 Concrete Reservoirs, Two Valve Chambers for Reservoir 
  • CONTRACT AMOUNT: Birr 2,034,957.41
  • CONTRACT SIGNED:
  • STATUS:

Sala Gorbe2 Water Supply Project

  • OWNER: Sidama Zone Water Resources Development Office
  • MAJOR ACTIVITIES: Distribution Network, Six-fauceted Water Points (6), Valve Chambers in Network (7) 
  • CONTRACT AMOUNT: Birr 1,110,796.72
  • CONTRACT SIGNED:
  • STATUS:

Ambo Wuha Spring Development

  • OWNER: Hawassa Town Water Supply and Sewerage Authority
  • MAJOR ACTIVITIES: Access Road, Spring Capping, 50 M3  RC circular wet-well.
  • CONTRACT AMOUNT: Birr 1,687,394.00
  • CONTRACT SIGNED:
  • STATUS:

2. Irrigation Construction Projects

Wunki Small Scale Irrigation Project

  • LOCATION: Gurage zone, Enemor & Ener Wereda
  • OWNER: SNNPR Water Resources Development Bureau (ADB-ASSP)
  • MAJOR ACTIVITIES: Diversion Weir, 4.8 km Main Canal, Secondary Canals and Farm System for 100-120 hectare, 480 Household beneficiaries.
  • CONTRACT AMOUNT: Birr 3,218,292.00
  • CONTRACT SIGNED:
  • STATUS: Completed

Adilo Small Scale Irrigation Project

  • LOCATION: Sidama zone, Bensa Wereda
  • OWNER: SNNPR Water Resources Development Bureau (ADB-ASSP)
  • MAJOR ACTIVITIES: Diversion Weir, Main Canal, Secondary Canals, Farm System for 100 hectare, 400 Household beneficiaries.
  • CONTRACT AMOUNT: Birr 3,585,341.00
  • CONTRACT SIGNED:
  • STATUS: Completed

Bazra Small Scale Irrigation Project

  • LOCATION: South Omo Zone, Semen Ari Wereda and Basketo special Wereda
  • OWNER: SNNPR Water Resources Development Bureau (ADB-ASSP)
  • MAJOR ACTIVITIES: Diversion Weir, Main Canal, Farm System.
  • CONTRACT AMOUNT: Birr 1,921,940.00
  • CONTRACT SIGNED:
  • STATUS: Completed

Adele Small Scale Irrigation Rehabilitation Project

  • LOCATION: Gurage zone, Sodo Wereda
  • OWNER: SNNPR Water Resources Development Bureau
  • MAJOR ACTIVITIES: Pump House Construction, Pond and Flood Protection Construction.
  • CONTRACT AMOUNT: Birr 1,166,658.36
  • CONTRACT SIGNED:
  • STATUS: On Going

Lintala Small Scale Irrigation Project

  • LOCATION: Welayta Zone, Humbo Wereda.
  • OWNER: SNNPR Water Resources Development Bureau (AFD)
  • MAJOR ACTIVITIES: Diversion Weir, Main Canal, Secondary Canals, Farm System for 140 hectare, 560 Household beneficiaries.
  • CONTRACT AMOUNT: Birr 2,506,827.00
  • CONTRACT SIGNED:
  • STATUS: Completed

Furfuro Small Scale Irrigation Project

  • LOCATION: Silte Zone, Dalocha Wereda.
  • OWNER: SNNPR Water Resources Development Bureau (AFD)
  • MAJOR ACTIVITIES: Diversion Weir, Main Canal, Secondary Canals, Tertiary Canals, Night Storage, for 153 hectare, 612 Household beneficiaries.
  • CONTRACT AMOUNT: Birr 7,417,069.00
  • CONTRACT SIGNED:
  • STATUS: Completed

Fulame Small Scale Irrigation Project

  • LOCATION: Kembata Tembaro Zone, Angacha Wereda.
  • OWNER: SNNPR Water Resources Development Bureau (FS)
  • MAJOR ACTIVITIES: Diversion Weir, Main Canal, Secondary Canals, Farm System for 70 hectare, 240 Household beneficiaries.
  • CONTRACT AMOUNT: Birr 3,555,887.40
  • CONTRACT SIGNED:
  • STATUS: Completed

Bawaye Small Scale Irrigation Project

  • LOCATION: Amaro Special Wereda.
  • OWNER: Amaro Development Association in Collaboration with Norwegian Church Aid. 
  • MAJOR ACTIVITIES: Diversion Weir, 2.9 Km Main Canal, Secondary Canals, 50 Drop Structures, Farm System for 100 hectare, 400 Household beneficiaries.
  • CONTRACT AMOUNT: Birr 1,706,699.00
  • CONTRACT SIGNED:
  • STATUS: Completed

Sille Small Scale Irrigation Rehabilitation Project

  • LOCATION: Gamo Gofa Zone, Arbaminch Zuriya Wereda.
  • OWNER: SNNPR Water Resources Development Bureau (Gov't)
  • MAJOR ACTIVITIES: Rehabilitation of Head Work and Main Canal for 200 hectare, 800 Household beneficiaries.
  • CONTRACT AMOUNT: Birr 2,773,333.00
  • CONTRACT SIGNED:
  • STATUS: Completed

Gatto Small Scale Irrigation Project

  • LOCATION: Konso and Derashe Special Weredas.
  • OWNER: SNNPR Water Resources Development Bureau (FS)
  • MAJOR ACTIVITIES: Rehabilitation of Diversion Weir, Main Canal, Secondary Canals, and Farm System for 200 hectare, 800 Household beneficiaries.
  • CONTRACT AMOUNT: Birr 2,298,868.00
  • CONTRACT SIGNED:
  • STATUS: Completed

Ratte Medium Scale Irrigation Project

  • LOCATION: South Omo Zone, Dasenech Woreda.
  • OWNER: SNNPR Irrigation De4velopment and Schemes Administration Agency
  • MAJOR ACTIVITIES: Pump House, Main Canal, Secondary Canals, and Farm System for 1000 hectare.
  • CONTRACT AMOUNT: Birr 68,811,643.00
  • CONTRACT SIGNED:May 2010
  • STATUS: On going

 

3. Water Well Drilling Construction Projects